Completed Projects
FAFB - Sere water mains
As the Subcontractor we performed Excavation, including trench safety, rock breaking, import and export of materials, install of water mains from 12" pvc/ductile, to 6" pvc/ductile.
Contract - $1,200,000
100 Working days
Washinton national guard - landscape boundary
As a prime contractor we self performed, excavation, concrete curbs and paving, final grading.
Contract - $225,000
40 Working days
fafb - miller park splash pad
As the Subcontractor we performed Excavation, Utilities, Concrete structural/flat work, sewer pipe, water pipe hot tap, electrical trenching, and landscaping. The Prime contractor was Rore Const.
Contract - $200,000
40 Working days
Walmart Spokane Wellesly - online pickup
As the Subcontractor we performed Excavation, Utilities, Concrete structural and flat work. The Prime contractor was Sletten Const.
Contract - $206,000
45 Working days
Walmart Spokane valley - online pickup
As the Subcontractor we performed Excavation, Utilities, Concrete structural and flat work. The Prime contractor was Sletten Const.
Contract - $354,000
65 Working days
Costco St. George UT - Chiller and freezer
As the Prime Contractor we self-performed Excavation, Concrete structural and flat work. Sub-contracted scopes include, Fire sprinklers, Asphalt, Landscaping, Concrete cutters.
Contract - $655,000
65 Working days
Veterans Grant - hulse bathroom addition
As a prime contractor we designed this project, we also managed, and self performed, Excavation, concrete structural/Flat, Framing, siding, roofing with sub contractors for Plumbing, electrical, Paint, and epoxy flooring.
Contract - $136,000
45 Working days
STA - Eagal station
As the Prime Contractor we self-performed Excavation, Concrete structural and flat work, signage, curved butcher block seats and sheet metal. other scopes included plumbing, framing, Roofing, painted logos, electrical. This particular project was a challenging due to the curved structure be.
Contract - $845,000
45 Working days
Spokane valley Costco - Chiller addition
We acted as a sub-contractor suppling Excavation and concrete labor.
Contract - $160,000
45 Working days
Bia - Spokane detention center lighting and hvac
Operating as an Indian owned small business, D-McP managed this contract using multiple skilled sub-contractors. We completed a lighting retrofit that was projected to Save upward of $9,000 per month! We also replaced the HVAC roof unit and curb.
Contract - $101,000
45 Working days
Lakehurst Dr - Side road
100% SELF PERFORMED. Installed a side road at a private residence on diamond lake in medical lake WA. This included a 1000lb breaker, and block wall. This was by far the steepest hill side we have worked on. We learned a lot and were successful in completing the work!!
Contract - $30,000
15 Working days
WSU Spokane - South Parking lot
This was a locally funded public works project consisted Impanation of complete TCS select demolition to remove Curbs, Side Walks, Trees and other obstructions. Clear, Grub and prep for new driveway entry with COS approach with multiple ped ramps. Included 2 60x12 swales with Ductile equalizer pipes. DMCP self-performed the excavation, and hauling. We were able to complete the main scope of work withing 7 days, on the seventh day we had excavation, rolled curb and back top completed.
Contract - $163,000
21 Working days
Cheney Safe Routs to school
This was a locally funded public works project consisted Impanation of complete TCS select demolition to remove Curbs, Side Walks, Trees and other obstructions. Clear, Grub and prep for new monolithic sidewalk (1,500 LFT) and 900 linear feet of 10 foot asphalt paths. DMCPC also designed and installed pit-run bridging for the path at the park in order to keep it up out of a saturation prone area.
Contract - $475,000
40 Working days
STa Lighted Pit Repair
This was a locally funded public works project consisted of select demolition to remove corroded steel framing at three lighted maintenance pits, installation of new framing, new fall protection, cleaning and application of new protective coatings, as well as the repair or addition of structural support in select areas.
Client Representative: Jessica Charlton
Spokane Transit Authority
Contract - $291,000
66 Working days
Deck And Roof
Remove and replace old out of spec deck.
Client Representative: Residential
$26,000
20 working days
Helical piles Washintion St.
Excavate and install Helical Piles repair all damages
Client Representative: Residential
$32,000
5 working days
1 Subcontractors
1 Structural Engineer
Orchard Park Pavilion
Construct 4k square foot Canopy
Client Representative: Scott Bernhard City of Liberty Lake
$563,000
50 working days
8 Subcontractors
Fairchild Air Force Base
Commercial Kitchen Appliance Install
Client Representative: Tad Miles
$12,000
3 working days
3 Subcontractors
ONION CREEK SCHOOL DISTRICT 30
Roof Over Slab
School Representative: Hugh Humes
Onion Creek School District
Value $151,776
28 working days
3 Subcontractors
Concrete Paths
Concrete Paths
Representative: Residential
Value $10,000
5 working days
0 Subcontractors
STCu bonner
General Carpentry
Representative: Meridian Construction
Value $5,000
5 working days
0 Subcontractors